Extensão da autoestrada M1 Pacific até Raymond Terrace 

Entre em contato conosco
/ 01

Detalhes do Projeto

The M1 Pacific Motorway Extension to Raymond Terrace completes a critical missing link in Australia’s east coast transport network, creating a continuous 15-kilometre motorway connection between Black Hill and Raymond Terrace. The new route improves journeys through the Hunter by bypassing long-standing congestion points at Hexham and Heatherbrae, strengthening connections between Newcastle, the NSW North Coast and the Sydney to Brisbane corridor. 

A defining feature of the project is the 2.6-kilometre viaduct spanning the Hunter River floodplain, the Main North Rail Line and the New England Highway. Delivered across a complex and environmentally sensitive corridor, the bridge structures required carefully planned construction systems and sequencing to support efficient delivery while limiting disruption to surrounding road and rail networks.

Nosso papel:

Involved from tender on the Black Hill to Tomago package, CaSE worked with the John Holland–Gamuda site team and permanent works designers to develop integrated temporary works for the viaduct columns and headstocks. 

The packages combined modular column formwork, foundation supports, reusable friction brackets at different heights, working platforms and access with headstock formwork and falsework, friction collars, supporting beams and lifting arrangements. Access staircases could serve multiple construction stages without relocation and, when a move was needed, be crane-lifted as a complete unit. 

Early collaboration helped rationalise more than 70 headstock shapes into a smaller set of repeatable forms accommodating straight and skew configurations and different column diameters. Reusable formwork and supports could be relocated between piers, reducing repeated assembly and disassembly and supporting the transition to SuperT installation. 

Design addressed the full construction sequence: fabrication specifications, installation sequencing and tolerances, operational requirements, and dismantling using simple splice connections. Considering access and lifting throughout helped minimise work at height and made the integrated systems practical to build, use and reuse

Localização
Região de Hunter, Nova Gales do Sul
Valor do projeto
Contratante
John Holland–Gamuda Joint Venture
Setor
Entre em contato conosco
/ 04

Serviços

  • Projeto de Estruturas temporárias
  • Column and headstock formwork design
  • Falsework and friction collar design
  • Working platforms and construction access
  • Lifting systems and erection sequencing
  • Construction methodology and constructability support