The Kangaroo Point Green Bridge is more than just a new crossing, it’s a landmark addition to Brisbane’s cityscape and a critical piece of active transport infrastructure. 

Spanning 470 metres, the single-mast cable-stayed bridge connects Kangaroo Point to Brisbane’s CBD, dramatically improving access for pedestrians and cyclists while reducing traffic on the Story Bridge. With riverside dining, shaded viewing decks, and a sweeping architectural profile, it has become a must-visit destination for residents and visitors alike. 

Construction commenced in 2021 and was completed in 2024. The bridge reaches a height of up to 12.7 metres above high-water level, matching the Victoria and Captain Cook Bridges, and delivers a 6.8-metre-wide shared path for active users. 

Nosso papel:

As a key subcontractor to BESIX Watpac, CaSE & Pike Design delivered the temporary works design for this complex and highly technical project. 

The scale and logistics of the bridge construction required adaptable and robust engineering solutions. From managing 180-tonne mastheads (each the weight of three double-decker CityCat ferries) to maintaining the long-term stability of girders during transport and installation, our team provided critical design services to ensure a smooth and safe build sequence. 

Localização
Queensland, Austrália
Valor do projeto
$300 million
Status do projeto
Completion 2024
Contratante
BESIX Watpac
Entre em contato conosco
/ 04

Serviços

 

  • Crane lift studies for safe loading and unloading of modules 
  • Lashing and support design to restrain bridge modules during barge transportation 
  • Design of custom girder module lifting lugs, rigging, and lift plans 
  • Jack and sliding box design to align bridge segments with precision during installation and splice welding 
  • Stressing and welding platform design for on-site assembly 
  • Review of pylon mast constructability and connection design
  • Temporary supports for girders during storage at the Port of Brisbane Interface planning for Self-Propelled Modular Transporters (SPMTs) used to move and load bridge segments onto barges 