The Botany Rail Duplication (BRD) project involved duplication of 3 km of single-track rail line to create a double-track freight corridor between Mascot and Botany, improving rail capacity to Sydney Airport and Port Botany. Works included removal and replacement of two existing bridges with post-tensioned concrete structures spanning major intersections and motorways, including O’Riordan Street and the Southern Cross Drive Motorway.

Construction was completed under highly constrained urban conditions, requiring extensive planning, interface management, and staged weekend possessions to minimise disruption to road users and the freight network.

Nuestro rol

CaSE & Pike Design delivered specialist temporary works design and third-party independent design verification directly to John Holland and through subcontractors Freyssinet, Zoomwave, and Sarens.

CaSE Contractors seconded key engineering and project staff to John Holland’s team, supporting temporary works coordination, on-site engineering, environmental control, and validation of remedial action plans.

Ubicación
Nueva Gales del Sur, Australia
Valor del proyecto
$440M
Contratista
ARTC, John Holland and Aurecon
Contáctenos
/ 04

Servicios

  • Heavy lifting and removal checks for existing bridges
  • Steelwork and SPMT support design for bridge removal
  • Formwork and falsework systems for main bridge girders
  • Lateral restraint and sliding/lowering design for concrete girders
  • Complex truss bridge falsework removal sequencing
  • Spreader frame design for bridge falsework lift/lowering
  • Lifting and storage design of precast planks
  • Coordination of Temporary Works and on-site Project Engineering
  • Environmental control support and RAP validation
  • Operations & Maintenance Manual preparation