{"id":8978,"date":"2026-07-06T23:24:08","date_gmt":"2026-07-06T23:24:08","guid":{"rendered":"https:\/\/www.case.international\/?post_type=team&#038;p=8978"},"modified":"2026-07-07T00:41:49","modified_gmt":"2026-07-07T00:41:49","slug":"anil-jose","status":"publish","type":"team","link":"https:\/\/www.case.international\/pt\/team\/anil-jose\/","title":{"rendered":"Anil Jose"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Anil is a Principal Structural Engineer with more than 18&nbsp;years' experience delivering bridge, transport and infrastructure projects across Australia, the Middle East and Asia. His experience spans concrete, steel, and prestressed structures, with particular expertise in cable-stayed bridges, segmental bridge systems, construction-stage analysis, temporary works and complex structural assessments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">His core strengths include bridge design, deriving solutions from first principles, independent design checking, structural investigations, remediation design and construction methodology. Anil combines strong analytical capability with a practical understanding of how structures are built, bringing a construction-first mindset that helps clients and project teams resolve technical challenges efficiently and safely through all stages of delivery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Anil works closely with contractors, designers, and multidisciplinary teams to develop coordinated, buildable solutions for complex infrastructure environments. His experience leading engineering and drafting teams, coupled with his collaborative approach and focus on technical excellence, enables him to deliver practical outcomes on projects ranging from major transport corridors to complex bridge rehabilitation programs.<\/p>\n\n\n\n<div style=\"height:36px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Experi\u00eancia em Projetos Chave<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With CaSE-Middle East<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hudayriat Island Cycle Track Bridges, Abu Dhabi, UAE<\/li>\n\n\n\n<li>Quattro Del Mar, Ras Al Khaimah, UAE<\/li>\n\n\n\n<li>Dubai Metro Blue Line (Ongoing), Dubai, UAE<\/li>\n\n\n\n<li>High Speed Rail Project (Ongoing), Dubai, UAE<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Prior Experience<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Etihad Rail Project P2225 (Station Link), Abu Dhabi, UAE<\/li>\n\n\n\n<li>Sheikh Zayed Road &amp; Ras Al Khor Road Architectural Pedestrian Bridge Canopies, Dubai, UAE<\/li>\n\n\n\n<li>Ras Al Khor Bridges Bearing Replacement, Dubai, UAE<\/li>\n\n\n\n<li>Dammam Al-Khafji Highway Interchange-2, Eastern Province, Saudi Arabia<\/li>\n\n\n\n<li>Umm Lafina Bridge, Abu Dhabi, UAE<\/li>\n\n\n\n<li>Bridge over Maliha Road, Sharjah, UAE<\/li>\n\n\n\n<li>Dubai Metro \u2013 Expo Link, Dubai, UAE<\/li>\n\n\n\n<li>Mumbai\u2013Pune Expressway Cable-Stayed Bridge, Maharashtra, India<\/li>\n\n\n\n<li>Ghana Volta Rail Bridge, Ghana<\/li>\n\n\n\n<li>Mesaimeer Road (P008 C3) Construction &amp; Upgrade, Doha, Qatar<\/li>\n<\/ul>","protected":false},"featured_media":8980,"template":"","class_list":["post-8978","team","type-team","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/team\/8978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/team"}],"about":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/types\/team"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/media\/8980"}],"wp:attachment":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/media?parent=8978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}