{"id":9031,"date":"2026-08-05T05:38:16","date_gmt":"2026-08-05T05:38:16","guid":{"rendered":"https:\/\/www.case.international\/?post_type=projects&#038;p=9031"},"modified":"2026-08-05T06:34:20","modified_gmt":"2026-08-05T06:34:20","slug":"kangaroo-point-green-bridge","status":"publish","type":"projects","link":"https:\/\/www.case.international\/pt\/projects\/kangaroo-point-green-bridge\/","title":{"rendered":"Ponte Kangaroo Point Green"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Kangaroo Point Green Bridge is more than just a new crossing,&nbsp;it\u2019s&nbsp;a landmark addition to Brisbane\u2019s cityscape and a critical piece of active transport infrastructure.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Spanning 470 metres, the single-mast cable-stayed bridge connects Kangaroo Point to Brisbane\u2019s CBD, dramatically improving access for pedestrians and cyclists while reducing traffic on the Story Bridge. With riverside dining, shaded viewing decks, and a sweeping architectural profile, it has become a must-visit destination for residents and visitors alike.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction&nbsp;commenced&nbsp;in 2021 and was completed in 2024. The bridge reaches a height of up to 12.7 metres above&nbsp;high-water&nbsp;level,&nbsp;matching the Victoria and Captain Cook Bridges,&nbsp;and delivers a 6.8-metre-wide shared path for active users.&nbsp;<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Nosso papel:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As a key subcontractor to BESIX Watpac,&nbsp;CaSE&nbsp;&amp;&nbsp;Pike Design&nbsp;delivered the temporary works design for this complex and highly technical project.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The scale and&nbsp;logistics&nbsp;of the bridge construction&nbsp;required&nbsp;adaptable and robust engineering solutions. From managing 180-tonne mastheads (each the weight of three double-decker&nbsp;CityCat&nbsp;ferries) to&nbsp;maintaining&nbsp;the long-term stability of girders during transport and installation, our team provided critical design services to ensure a smooth and safe build sequence.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"featured_media":9033,"template":"","class_list":["post-9031","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/projects\/9031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/media\/9033"}],"wp:attachment":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/media?parent=9031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}