{"id":8999,"date":"2026-07-09T00:56:32","date_gmt":"2026-07-09T00:56:32","guid":{"rendered":"https:\/\/www.case.international\/?post_type=projects&#038;p=8999"},"modified":"2026-07-09T00:56:32","modified_gmt":"2026-07-09T00:56:32","slug":"dubai-metro-blue-line","status":"publish","type":"projects","link":"https:\/\/www.case.international\/pt\/projects\/dubai-metro-blue-line\/","title":{"rendered":"Dubai Metro Blue Line\u200b"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Dubai Metro Blue Line is a 30 km rapid transit link scheduled to open on 9 September 2029. It connects the existing Red and Green Lines across Dubai,\u00a0extending access to key districts such as Mirdif, Dubai Silicon Oasis, and Dubai\u00a0Creek\u00a0Harbour, while providing a new connection to Dubai International Airport.\u200b<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u200bThe alignment includes approximately 15.5 km of underground track and 14.5 km\u00a0ofelevated track, supported by 14 new stations, including major interchanges at\u00a0Creek,Centrepoint, and International City.\u00a0\u200b<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u200bThe Blue Line will also introduce Dubai\u2019s first metro bridge over the Creek and a landmark signature station at Dubai Creek\u00a0Harbour. With an expected daily\u00a0capacity of around 320,000 passengers by 2040, the project supports the Dubai\u00a02040 Urban Master Plan and is the first transport project in the city to target a\u00a0Platinum Green Building rating, reflecting a strong commitment to sustainable\u00a0development<\/p>\n\n\n\n<div style=\"height:36px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Our Scope:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">CaSE\u00a0ME has been appointed by MLCC Blue Line Contracting LLC, the main\u00a0contractor, to provide independent design verification services for the temporary\u00a0works. The scope includes the design and verification of prestressed segmental\u00a0concrete props used for balanced cantilever erection, pier collars for the\u00a0installation of precast pier head shells, and other temporary structural systems\u00a0that support the safe and efficient assembly of the permanent work<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"featured_media":9001,"template":"","class_list":["post-8999","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/projects\/8999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/media\/9001"}],"wp:attachment":[{"href":"https:\/\/www.case.international\/pt\/wp-json\/wp\/v2\/media?parent=8999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}